You Are Here:  Services ... Water & Wastewater SCADA
Search Here:    
Water and Wastewater SCADA Systems Engineering

Insyght staff have been involved in all phases of Water and Wastewater SCADA System Engineering assignments, from Master Planning/Standards Development to SCADA Construction Administration. Some of the key project types, and reference projects, are as follows. Details on some of these projects are included on the Project Profiles, attached.

  SCADA Upgrade Master Plans
Included conceptual designs, scope, timeline, and implementation costs, including how to transition from the existing to the new systems.
  • Hamilton SCADA Optimization Report
  • Lake Huron Regional Water Supply System PLC Upgrade
  • Elgin Area Regional Water Supply System PLC Upgrade
  • St. Thomas Secondary Water Supply SCADA
  • Aylmer Secondary Water Supply System SCADA
  • Port Burwell Secondary Water Supply System SCADA
  • Municipality of Central Elgin SCADA
  • Halton Skyway Chemical & Polymer System Upgrades


 

  Development of SCADA Standards
Included field instruments, field wiring, controller hardware and software, SCADA software, computer hardware and software, networking equipment and concepts, and equipment coding systems. This also includes setting up electronic solutions to properly manage this information, including version control.
  • Regional Municipality of Niagara SCADA Standards
  • Hamilton SCADA Optimization Report
  • Lake Huron Regional Water Supply Systems
  • Elgin Area Regional Water Supply Systems
  • St. Thomas Secondary Water Supply Systems
  • Aylmer Secondary Water Supply Systems
  • Port Burwell Secondary Water Supply Systems
  • Municipality of Central Elgin
  • Halton SCADA Standards Update
 


 

  SCADA/Electrical Detailed Design
Included facility and wide area SCADA network architectures, control schematics, electrical power, field instruments, controller hardware and software, SCADA software, computer hardware and software, and networking equipment.
  • Windsor Lou Romano WPCP
  •   Ottawa Sewage Pump Station Automation Upgrades
  • Hamilton Fibre Optic Wide Area Network Implementation
  • Lake Huron PLC & SCADA Upgrade
  • Elgin Area PLC & SCADA Upgrades
  • St. Thomas Water and Wastewater SCADA Upgrades
  • Alymer Water and Wastewater SCADA Strategic Plan
  • Central Elgin Water and Wastewater SCADA Strategic Plan & Implementation
  • Hamilton Chedoke WPS Design
  • Kelso Water System


 

  SCADA Wide Area Networks
Included 10-80 remote sites linked by Ethernet using leased fibre optic networks, dedicated telephone circuits, or leased radio links.
  • Hamilton Fibre Optic Wide Area Network Implementation
  •   Lake Huron & Elgin Area Region SCADA Wide Area Network


 

  Independent Software and Field Installation Acceptance Testing
Included acting as the owner's representative, independent of both the SCADA designers and contractor, to execute and document the fully complete software testing, using standardized testing analysis and reporting forms.
  • Hamilton Water & Wastewater Capital Projects SCADA Report
  •   Hamilton Commissioning Support
  • Hamilton SCADA Expert Support, Operating Contract Transition Team
  • Halton Region Acton WWTP Software Programming Support
  • Niagara Nigh South Programming
 